- Introduction
- 1: Agree on a Common Definition of Capacity Planning
- 2: Select a Capacity Planning Process Owner
- 3: Identify Key Resources To Be Measured
- 4: Measure the Current Utilizations of the Resources
- 5: Compare Current Utilizations to Maximum Capacities
- 6: Collect Meaningful Workload Forecasts from Representative Users
- 7: Transform Forecasts into Resource Requirements
- 8: Map Requirements Onto Existing Utilizations
- 9: Predict When the Shop Will Be Out of Capacity
- 10: Update Forecasts and Utilizations
- Harris Kern's Enterprise Computing Institute
Like this article? We recommend
3: Identify Key Resources To Be Measured
Once the process owner is selected, one of his or her first tasks will be to identify the infrastructure resources whose utilizations or performance need to be measured. This determination is made based on current knowledge about which resources are most critical to meeting future capacity needs. In many shops, these resources will revolve around network bandwidth; the number and speed of server processors; or the number, size, or density of disk volumes comprising centralized secondary storage. Following are some other resources often identified for consideration:
- Channels
- Tape drives
- Centralized memory in servers
- Centralized printers
- Desktop processors
- Desktop disk space
- Desktop memory