Summary
The system requirements flow-down is the beginning of the Design phase of the RADIOV DFSS process, initiating activities for predictive engineering: to design and optimize the flowed-down parameters at the subsystem, subassembly, module, and component level in order to provide high confidence that expectations for the system-level critical parameters will be successfully met. The systems (software and hardware) requirements flow-down also initiates focused activities in the systems/field test and supply chain to help develop confidence in meeting the flowed-down requirements.