Throughout both IT and business, project management is undergoing a profound paradigm shift -- from rigid and mechanistic approaches derived from the engineering and construction industries, to dynamic and flexible approaches that anticipate rapid change in technology, organizations and development approaches. In eXtreme Project Management, world-renowned project management expert Rob Thomsett presents the first one-stop guide to these powerful, radical new project management techniques. Thomsett's innovative Extreme Project Management techniques look outward to stakeholders, management and clients, and involve them heavily in the project management process. Thomsett introduces creative new processes such as RAP (RApid Planning) sessions; shows how to facilitate "open" rather than "closed" planning; and demonstrates how to integrate risk management and quality without diminishing the flexibility today's projects demand. Above all, eXtreme Project Management teaches you how to align trust, creativity, openness, and fun with a relentless focus on realizing project benefits and maximizing business value.

Sample Content

Online Sample Chapter

eXtreme Project Management Concepts

Table of Contents



Preface.

PART I.

1. The New Project Environment.

Forces Driving Change. Driving Force 1: A Power Shift. Driving Force 2: The Free Agent Army. Driving Force 3: The Global E-Economy.

2. Project Management Evolution.

The Four Waves of Project Management.

3. eXtreme Concepts.

Project Management Versus Technical Management. Context and Content. Whole-of-Life Project Management. Project Manager as Facilitator. Sponsors as Executive Project Managers. Scenario Planning. The L.A. Law Model. Rapid Planning. Virtual Teams. It's the Context, Stupid.

PART II.

4. eXtreme Project Management Context.

Two Very Different Types of Work. Process Work. The Two Cultures in Conflict. The Categories of Project Work. Project Size.

5. The eXtreme Project Management Model.

Project Management Processes. Project Justification, Approval, and Review. The Critical Information for Project Approval. Project Planning. Project Tracking. Project Reporting and Change Control. Postimplementation Reviews. A Note on the Project Initiation and Feasibility Study. The Project Charter or Business Case. The Only Stable Thing Is Change.

6. The RAP Process.

Why Should We Run RAP Sessions? Different Stakeholders, Different Agendas. Great IdeaúBut I Don't Have a Team Yet. The RAP Structure. RAP Technology. How Long Should a RAP Take?

7. Analyze Project Success.

What Are Expectations? The Seven Success Criteria. Degree or Level of Stakeholder Satisfaction. Meeting of Objectives and Requirements. Meeting Budget. Meeting Deadlines. Added-Value Requirements. Quality Requirements. Team Satisfaction. eXtreme Tool 1: Success Sliders. Don't Panic! It Is Meant to Be Subjective.

8. Define Scope, Objectives, and Stakeholders.

What Is the Difference between Scope and Objectives? Conflict Is Inevitable. Levels of Objectives. Refining Your Objectives. Let's Not Get Physical. Don't Fence Me in. Stakeholders and Related Projects. What Is a Stakeholder? Related Projects: A Special Case of Stakeholder. Focus and Communicate. Formalizing Stakeholder Relationships. Sponsor Agreement: The Most Important of All. Who Is Your Team?

9. Analyze Added Value.

The State of the Art. Problems with Traditional Cost/Benefit Approaches. The Ultimate Fiddle. Added-Value Analysis. The Added-Value Chain. The IRACIS Model. Actual Versus Notional Costs. Shadow Pricing: Hedonic Costing and Contingent Valuation. Benefits Realization. Cost-Effectiveness Model. Another Form of Double-Counted Benefits. Additional Added-Value Drivers. A Final Note on Added-Value Analysis.

10. Define Quality.

Project Quality Deployment. Linking Product and Process Quality: QFD. What Is a Quality? Toward an Effective Quality Plan: PQD in Action. Step 1: Define the Product Requirements. Step 2: Negotiate Product Quality Attributes. Step 3: Review Quality Attributes with Your Sponsor. Repeat Until. Quality Index. Quality in Action. Quality Assurance Drivers. Quality Assurance Principles. Quality, Estimates, Costs, and Risks. The Impact of Quality. The Hot Buttons. A Final Note on Quality for Now.

11. Select a Development Strategy.

Strategy Ain't Methodology. The Four Development Strategies. Monolithic or Waterfall. Release, Version, or Incremental. Fast Track, Evolutionary, or Production Prototyping. Hybrid. Rapid Application Development (RAD), Agile, and Other Variations. RAD or Time-Boxing. Radical Fast Track. Microsoft's Daily Build. Agile, Lite, or Extreme Methods. Mixing and Matching. Partitioning Guidelines. By Function or Data. By Stakeholder. By Benefits. Strategy Selection. Strategy as a Change Control. Strategy and Risk Assessment.

12. Analyze Risk.

Project Risk Assessment Overview. Many Classes of Risk. Project Risk Management. Project Risk Assessment. Subjective Versus Objective Risk Assessment. The Risk Assessment Process. Overall Project Risk Assessment. Risk Containment or Reduction. Risk Management Plans. Risk Tracking and Reporting. Shooting the Messenger.

13. Develop Task Lists.

Develop Project Task Lists. Methodologies: A Brief Introduction. 1. Tailor Methodology. 2. Brainstorm Project Tasks. 3. Fine-Tune Your Methodology. 4. Review with Other Experts. 5. Repeat the Process. The Amazing 5/10 Day Rule. The Risk of the Project or Task. The Nature of the Task. The Experience of the Team Members. The Degree of Trust. A Moral Dilemma. Where Is the Moral Dilemma? Scenario and Real-Time Planning.

14. Estimate Tasks.

Causes of Estimation Error. Misestimating the Scope. Misestimating the Stakeholders' Effort. Misunderstanding the Quality. Miscalculating the Project Risk. Forgetting Tasks. Misunderstanding Your People. Estimation Overview and Principles. Getting Our Language Right. Project Estimation Points. Estimation Principles. Avoid Single-Person Estimation. Always Complete a Risk Assessment Prior to Estimation. Where Possible, Use Relevant Experts. Always Carefully Document Estimating Assumptions. Review the Work Breakdown Structures. Always Undertake Sensitivity Analysis. The Detailed Estimation Process. Saying No Revisited. A Review of Risk Assessment. Develop a Work Breakdown Structure. Complete a Function Point Estimate. Complete Team-Based Estimates. Not Another Note on Sensitivity Analysis! Adjust for Quality Agreement.

15. Develop Schedule.

Develop Project Execution Plan. Step 1: Develop a First-Cut Network. Step 2: Adjust Estimates to Elapsed Days. Step 3: Develop First-Cut Schedule. Step 4: Schedule Actual Resources. Step 5: Adjust the Schedule as Required. Scenario Planning Revisited. Develop Project Staffing Agreements. Oops! Wrong Planet, Wrong Person. A Typical Skill Model. Virtual Team Twist.

16. Develop Return on Investment.

Develop Cost and ROI Scenarios. ROI Fundamentals. Analyzing Project Costs. Future and Present Values. Developing Your ROI. Cost-Effectiveness.

17. Project Tracking and Reporting.

Project Tracking. The Tracking Mechanism. The Use of Automated Project Management Tools. Various Tracking Concepts. We Aren't Painting Walls: We Are Building Dreams. Tracking Mechanism. Tracking Summaries. Building a Project Metric Database. Project Reporting. Project Management and Technical Deliverable Reviews. The Project Reporting and Review Process. Really Radical Reports. Assistance to Projects. Reporting to Stakeholders. The Project Change Control Process. Maintaining the Project Management File. The Business Case Is the Focus of Everything.

18. Postimplementation Reviews.

The Postimplementation Review. The Postimplementation Review Focus. Don't Forget Your Sliders. The Timing of Postimplementation Reviews. The Learning Loop Concept. Client Satisfaction Surveys. The Postimplementation Review Team. The System Support Review. Benefits Realization Planning. The Benefits Realization Plan. The Project Sponsor's Role. Benefits Reviews.

19. Support.

The Support Problem. The Production Portfolio Concept. Portfolio Investment Effort. The Production Support Portfolio. The System Efficiency Review. Production System Activities and Support Costs. Passages: The Life Cycle of Production Systems. 1. New Product or System: Childhood. 2. Mature Product or System: Adulthood. 3. Old Product or System: Geriatric. Conclusion.

PART III.

20. Getting the Sponsor You Deserve.

Rule 1: The Bag of Money and the Baseball Bat. Rule 2: The Passive Conduit. Rule 3: You Generally Get the Sponsor You Deserve. Rule 4: In the Absence of Information, Executives Still Make Decisions. Rule 5: Educate as Well as Inform. Rule 6: The Level of Help You Get Is Inversely Proportional to Your Delay in Asking. Rule 7: Show Them the Money. Rule 8: Beam Us Up, Scotty. Rule 9: No Sponsor, No Start.

21. Getting the Stakeholders You Deserve.

Rob's Corporate Mathematics. Why You Need Your Stakeholders. How to Win Stakeholders Over. Remember They Have Other Jobs as Well. How to Get the Project You All Want.

22. A Question of Ethics.

Situation 1. Situation 2. Situation 3. Situation 4. Situation 5. Best Practice and Best Behavior. Organizational and Individual Impact. Drawing the Line - An Extreme Project Management Responsibility. A Draft Code of Ethical Behavior for eXtreme Project People.

23. The Success Sliders Redux.

Requirements Are Not the Same as Expectations. So, What Are Expectations? The Swiss Army Knife. Other Tips for Understanding Expectations. Become a Culture Vulture. Check out the Scenery. Learn Their Language. Say It Once, Hear It Many Times.

24. In Case of Emergencies.

The Dark Side. Dark Side 1: Don't Tell Anyone. Dark Side 2: Hope It Will Get Better. Dark Side 3: Covertly Degrade Quality. Dark Side 4: Covertly Degrade Functionality. Dark Side 5: Work Harder - Long-Term. Dark Side 6: Hire Consultants or Contractors and Blame Them. Dark Side 7: Blame Your “Users”. Dark Side 8: Blame Everyone - A Witch Hunt. Dark Side 9: Leave the Project. Dark Side 10: Add Lots of People - The Horde Model. Dark Side 11: Stop the Project. The Good Side. Good Side 1: Shift the Deadline. Good Side 2: Shift the Requirement. Good Side 3: Partition and Add People. Good Side 4: Overtly Degrade Quality. Good Side 5: Change the Technology. Good Side 6: Change the People. Good Side 7: Work Harder - Short-Term. Good Side 8: Leave the Project. Good Side 9: Mix and Match. Good Side 10: Stop the Project. Come to the Dark Side, Luke.

25. The Secret of Great Project Managers.
References.
Index.

Preface

Introduction

On a recent trip to London, I was amazed as my cabbie, Steve, nudged forward into the face of three lanes of oncoming traffic to cross a busy intersection that we had been waiting at for over five minutes. "Only a cabbie could pull that off," I commented, as we avoided potential accidents. Steve laughed and replied, "I have been driving cabs for 23 years. We cabbies have a term. We use the road. Other people drive but we use the road."

By bending rules, taking calculated risks, and using his experience of the many roads, lanes, and alleys of London, Steve made the journey faster, more efficiently, and safer by using rather than driving on the road.

Later I thought about the difference between "using the road" and "driving on the road" and the difference between eXtreme project management and traditional project management.

For people faced with too many projects, projects that seem to change every day, not enough good people, and not enough time and money, eXtreme project management is about using the road.

Why Should You Read This Book?

The simple answer to this question is for you to answer a couple of other questions:

  • I have a completely stable and realistic project plan.
  • My organization has a stable strategic plan.
  • My stakeholders are fully committed to my project.
  • My sponsor is fully effective and available to me quickly.
  • I have a completely clear statement of scope and objectives.
  • My team is loyal and devoted to the project.
  • We have effective risk and quality management plans.
  • My organization understands project management.
  • I have access to a group of expert project managers.
  • I have all the tools, technology, and techniques I need.
  • My project and organization are not changing rapidly.

If you answered "Yes" to all these questions, this book should be used to raise your Project Manager of the Century award higher for all to see and envy. If you answered "No" to any of these questions, this book will help you get a perfect score.

This book is about a new and radical approach to managing projects and teams--project management (XPM). It represents a quantum leap in project management.

Our group has been developing, implementing, and refining this approach over the past 25 years. This new project management approach is not based on academic theories or esoteric models. Rather, it has been forged through the experience of thousands of hours of practical experience in hundreds of real projects. The projects have been in virtually all sectors of business—most government areas, insurance, banking, health, computing software, information technology (IT) hardware and IT services, research and development, retail services, policy development, and manufacturing.

What Makes This Book Different?

eXtreme project management is fundamentally different from mainstream and traditional project management approaches.

eXtreme Project Management Test

To show the radical difference between eXtreme project management and traditional project management, let's explore the answers to this question: How do you determine the progress of a project?

The traditional project management answers to this question include:

  • Is the project meeting agreed deadlines?
  • Is the project in budget?
  • Have there been changes to the scope and objectives?

Indeed, most project management systems are based on reports only on budget and deadline compliance.

eXtreme project management adopts a completely different approach to measuring project success and progress:

  • Are stakeholders being informed and consulted about project status?
  • Have there been unapproved changes to scope and objectives?
  • Are the cost and benefits assumptions still valid?
  • Has the agreed product quality been compromised?
  • Are project risks unchanged?
  • Is the sponsor completely aware of the project status?
  • Are the team members satisfied with the project?

In effect, traditional project management looks inward and downward whereas, eXtreme project management looks outward and upward.

Over the past 25 years, we have studied and researched project management and related topics from as many perspectives as possible. We have read every book (currently more than 100) and article (many hundreds) on project management we can find. We have searched the Internet and have attended meetings of professional project management groups such as the Project Management Institute and the Australian Institute of Project Management. In addition, we have discussed our views and models with more than 20,000 project managers in our workshop series.

The longer we look, the more we are convinced that most published project management material has missed the mark. Either the models are too basic and simplistic or too theoretical and complex. In many cases, they are just unrealistic. For example, many project management texts suggest that you have to acquire and implement complex system or project development methodologies (at the cost of hundreds of thousands of dollars). Critical management issues such as quality, benefits realization, and risk were either completely ignored or plugged in as afterthoughts.

Sometimes we wonder whether the author or expert even lives on the same planet that we do! Their world seems so organized, so rational, so structured, and so devoid of the complex interpersonal politics we see every day in our clients that we wonder whether we have a distorted view of reality.

However, 20,000 people cannot be wrong. Our workshop participants do live on the same planet as we do and in the same world of complex organization dynamics.

Traditional project management approaches reflect the engineering and construction models of project management. They are based on a set of assumptions that are increasingly irrelevant in the chaotic and ambiguous world of organizations facing the new millennium. Concepts such as fixed requirements, long development time frames, stable teams and technology, and passive involvement of project stakeholders who trust their expert project managers have become historical myths.

Our new project management approach has been continuously refined and expanded to reflect the realities of the new business paradigm. It is based on a different set of assumptions that include dynamic requirements, compressed development schedules, virtual teams, unstable technology, and total involvement of project stakeholders. Our project management approach is totally focused on the analysis, measurement, and realization of financial benefits from the project, managing the total whole-of-life project cycle, complete integration of quality issues, and proactive project risk management.

We have evolved our project management approach to be as simple as it can be and as complex as it needs to be.

In his terrific book, Management of the Absurd, Richard Frason (1996) described how James Watt saw something that millions of other people had also seen but "not seen." It was Watt's observation of how steam coming from his tea kettle could be used to power steam engines that sparked the Industrial Revolution. Watt also saw the "invisible obvious" that so many others could not.

So much of this book is about the invisible obvious. Time and time again throughout this book, you'll find yourself saying "Of course! Why didn't I think of that? It's so obvious. It is so simple."

However, as Richard Riodan said when he was mayor of Los Angeles, "Simple and easy aren't the same words."

Most important, as we first stated in 1981 in People and Project Management (1981) and in Third Wave Project Management (Thomsett, 1992), our project management approach is totally focused on people and the relationships among the many people involved in projects.

What This Book Is Not About

This book is not about how to develop work breakdown structures and project schedules. It is not about developing simplistic and mechanical models such as project plans (which are never followed anyway). Most important, it is not boring. Many of the project management books that we have read present project management as some dry, cold, and quasi-scientific "pursuit."

We totally reject this view of project management. Our experience is that project management is one of the most challenging, creative, and exciting activities you can undertake. We hope that this is reflected in this book.

The Structure of the Book

To assist our readers who are under eXtreme project deadlines and working conditions, we have structured the book into three parts for quick access.

Part 1—eXtreme Concepts

This covers the background to XPM. We look at the evolution of project management, the emerging project environment, and the forces driving the need for XPM.

Part 2—eXtreme Tools

This introduces the XPM tools such as RAP sessions, learning loops, success sliders, and the detailed techniques used in XPM planning and tracking.

Part 3—Additional Resources

This includes readings that provide further tips; advanced tools; and related issues such as project sponsorship, negotiation, communication, ethics, and other critical project management concerns. There are additional readings available on our Web site www.thomsett.com.au

Each part is related but they can be read independently if you are in a hurry; though we hope you get to read the entire book eventually. Great project managers will read all of this book.

During our journey as consultants to major organizations, we have seen many strange and wonderful things. In many cases, what we observed put the bizarre events in the series The X Files to shame. At the end of the chapters in Part 2, we have included a section called The P Files (where P represents people or politics). The P Files entries support the points raised in the associated chapter.

A Note on Terminology

Throughout this book we refer to business projects. This term includes all the typical elements of business process redesign and development, new policy development, IT development, and change management. Readers who have either a business or IT background will find the concepts and techniques relevant. After all, there is no such thing as an IT project. eXtreme projects embrace and include all aspects of business, IT, policy, administration, human resources, change, and research effort that all projects should include. We also do not use the term user, which we dislike intensely, to refer to non-technical people. As we explain in the next chapter, this term has been used to marginalize and diminish the critical role that business experts and clients play in contemporary projects.

Updates

Submit Errata

More Information

InformIT Promotional Mailings & Special Offers

I would like to receive exclusive offers and hear about products from InformIT and its family of brands. I can unsubscribe at any time.

Overview


Pearson Education, Inc., 221 River Street, Hoboken, New Jersey 07030, (Pearson) presents this site to provide information about products and services that can be purchased through this site.

This privacy notice provides an overview of our commitment to privacy and describes how we collect, protect, use and share personal information collected through this site. Please note that other Pearson websites and online products and services have their own separate privacy policies.

Collection and Use of Information


To conduct business and deliver products and services, Pearson collects and uses personal information in several ways in connection with this site, including:

Questions and Inquiries

For inquiries and questions, we collect the inquiry or question, together with name, contact details (email address, phone number and mailing address) and any other additional information voluntarily submitted to us through a Contact Us form or an email. We use this information to address the inquiry and respond to the question.

Online Store

For orders and purchases placed through our online store on this site, we collect order details, name, institution name and address (if applicable), email address, phone number, shipping and billing addresses, credit/debit card information, shipping options and any instructions. We use this information to complete transactions, fulfill orders, communicate with individuals placing orders or visiting the online store, and for related purposes.

Surveys

Pearson may offer opportunities to provide feedback or participate in surveys, including surveys evaluating Pearson products, services or sites. Participation is voluntary. Pearson collects information requested in the survey questions and uses the information to evaluate, support, maintain and improve products, services or sites, develop new products and services, conduct educational research and for other purposes specified in the survey.

Contests and Drawings

Occasionally, we may sponsor a contest or drawing. Participation is optional. Pearson collects name, contact information and other information specified on the entry form for the contest or drawing to conduct the contest or drawing. Pearson may collect additional personal information from the winners of a contest or drawing in order to award the prize and for tax reporting purposes, as required by law.

Newsletters

If you have elected to receive email newsletters or promotional mailings and special offers but want to unsubscribe, simply email information@informit.com.

Service Announcements

On rare occasions it is necessary to send out a strictly service related announcement. For instance, if our service is temporarily suspended for maintenance we might send users an email. Generally, users may not opt-out of these communications, though they can deactivate their account information. However, these communications are not promotional in nature.

Customer Service

We communicate with users on a regular basis to provide requested services and in regard to issues relating to their account we reply via email or phone in accordance with the users' wishes when a user submits their information through our Contact Us form.

Other Collection and Use of Information


Application and System Logs

Pearson automatically collects log data to help ensure the delivery, availability and security of this site. Log data may include technical information about how a user or visitor connected to this site, such as browser type, type of computer/device, operating system, internet service provider and IP address. We use this information for support purposes and to monitor the health of the site, identify problems, improve service, detect unauthorized access and fraudulent activity, prevent and respond to security incidents and appropriately scale computing resources.

Web Analytics

Pearson may use third party web trend analytical services, including Google Analytics, to collect visitor information, such as IP addresses, browser types, referring pages, pages visited and time spent on a particular site. While these analytical services collect and report information on an anonymous basis, they may use cookies to gather web trend information. The information gathered may enable Pearson (but not the third party web trend services) to link information with application and system log data. Pearson uses this information for system administration and to identify problems, improve service, detect unauthorized access and fraudulent activity, prevent and respond to security incidents, appropriately scale computing resources and otherwise support and deliver this site and its services.

Cookies and Related Technologies

This site uses cookies and similar technologies to personalize content, measure traffic patterns, control security, track use and access of information on this site, and provide interest-based messages and advertising. Users can manage and block the use of cookies through their browser. Disabling or blocking certain cookies may limit the functionality of this site.

Do Not Track

This site currently does not respond to Do Not Track signals.

Security


Pearson uses appropriate physical, administrative and technical security measures to protect personal information from unauthorized access, use and disclosure.

Children


This site is not directed to children under the age of 13.

Marketing


Pearson may send or direct marketing communications to users, provided that

  • Pearson will not use personal information collected or processed as a K-12 school service provider for the purpose of directed or targeted advertising.
  • Such marketing is consistent with applicable law and Pearson's legal obligations.
  • Pearson will not knowingly direct or send marketing communications to an individual who has expressed a preference not to receive marketing.
  • Where required by applicable law, express or implied consent to marketing exists and has not been withdrawn.

Pearson may provide personal information to a third party service provider on a restricted basis to provide marketing solely on behalf of Pearson or an affiliate or customer for whom Pearson is a service provider. Marketing preferences may be changed at any time.

Correcting/Updating Personal Information


If a user's personally identifiable information changes (such as your postal address or email address), we provide a way to correct or update that user's personal data provided to us. This can be done on the Account page. If a user no longer desires our service and desires to delete his or her account, please contact us at customer-service@informit.com and we will process the deletion of a user's account.

Choice/Opt-out


Users can always make an informed choice as to whether they should proceed with certain services offered by InformIT. If you choose to remove yourself from our mailing list(s) simply visit the following page and uncheck any communication you no longer want to receive: www.informit.com/u.aspx.

Sale of Personal Information


Pearson does not rent or sell personal information in exchange for any payment of money.

While Pearson does not sell personal information, as defined in Nevada law, Nevada residents may email a request for no sale of their personal information to NevadaDesignatedRequest@pearson.com.

Supplemental Privacy Statement for California Residents


California residents should read our Supplemental privacy statement for California residents in conjunction with this Privacy Notice. The Supplemental privacy statement for California residents explains Pearson's commitment to comply with California law and applies to personal information of California residents collected in connection with this site and the Services.

Sharing and Disclosure


Pearson may disclose personal information, as follows:

  • As required by law.
  • With the consent of the individual (or their parent, if the individual is a minor)
  • In response to a subpoena, court order or legal process, to the extent permitted or required by law
  • To protect the security and safety of individuals, data, assets and systems, consistent with applicable law
  • In connection the sale, joint venture or other transfer of some or all of its company or assets, subject to the provisions of this Privacy Notice
  • To investigate or address actual or suspected fraud or other illegal activities
  • To exercise its legal rights, including enforcement of the Terms of Use for this site or another contract
  • To affiliated Pearson companies and other companies and organizations who perform work for Pearson and are obligated to protect the privacy of personal information consistent with this Privacy Notice
  • To a school, organization, company or government agency, where Pearson collects or processes the personal information in a school setting or on behalf of such organization, company or government agency.

Links


This web site contains links to other sites. Please be aware that we are not responsible for the privacy practices of such other sites. We encourage our users to be aware when they leave our site and to read the privacy statements of each and every web site that collects Personal Information. This privacy statement applies solely to information collected by this web site.

Requests and Contact


Please contact us about this Privacy Notice or if you have any requests or questions relating to the privacy of your personal information.

Changes to this Privacy Notice


We may revise this Privacy Notice through an updated posting. We will identify the effective date of the revision in the posting. Often, updates are made to provide greater clarity or to comply with changes in regulatory requirements. If the updates involve material changes to the collection, protection, use or disclosure of Personal Information, Pearson will provide notice of the change through a conspicuous notice on this site or other appropriate way. Continued use of the site after the effective date of a posted revision evidences acceptance. Please contact us if you have questions or concerns about the Privacy Notice or any objection to any revisions.

Last Update: November 17, 2020