About

Features

The definitive guide to managing the "Triple Constraint" at the heart of every project: time, cost, and quality 

  • Deep practical insight into the successful design, management, and control of complex modern projects
  • Real case studies, proven applications, and actionable solutions – not theory
  • Indispensable for experienced project management and anyone pursuing PMI/PMBOK or PRINCE2 certification

Description

  • Copyright 2015
  • Dimensions: 6" x 9"
  • Pages: 384
  • Edition: 1st
  • Book
  • ISBN-10: 0-13-383975-3
  • ISBN-13: 978-0-13-383975-3

Mastering Project Time Management, Cost Control, and Quality Management gives managers powerful insights and tools for addressing the "Triple Constraints" that define virtually every project: time, cost, and quality.

This book is part of a new series of seven cutting-edge project management guides for both working practitioners and students. Like all books in this series, it offers deep practical insight into the successful design, management, and control of complex modern projects. Using real case studies and proven applications, expert authors show how multiple functions and disciplines can and must be integrated to achieve a successful outcome.

Individually, these books focus on realistic, actionable solutions, not theory. Together, they provide comprehensive guidance for working project managers at all levels, including highly-complex enterprise environments. These books also provide indispensable knowledge for anyone pursuing PMI/PMBOK or PRINCE2 certification, or other accreditation in the field.

Sample Content

Online Sample Chapter

Introduction to Mastering Project Time Management, Cost Control, and Quality Management: Proven Methods for Controlling the Three Elements that Define Project Deliverables

Sample Pages

Download the sample pages (includes Introduction and Index)

Table of Contents

Introduction     1
The Triple Constraint     2
Managing Change Requirements     4
Managing Time, Cost, and Quality     7
    Managing Project and Product Scope     7
    Time Management     8
    Cost Management     9
    Quality Management     9
What Does the Customer Really Want?     10

Part I:  Project Time Management     13
Chapter 1  Planning Schedule Management     15

1.1 Introduction     15
1.2 Tools for Schedule Management Planning     16
    Minimum Requirements     17
    Plan Structures     18
    Project Management Office (PMO)     23
1.3 Information Gathering for the Schedule Management Plan     24
    Project Charter     24
    Project Manager’s Experience     25
    Organizational Past Projects     26
    Subject Matter Experts     27
1.4 Schedule Management Plan Applications     28
    Tactical Tool for Project Managers     28
    Communications Tool for the Project Staff     29
    Strategic Tool for the Organization     30
1.5 Summary     31
1.6 Review Questions     33
1.7 Key Terms     34
1.8 PMBOK Connections (Fifth Edition)     35
1.9 Case Study (Use for Part I, Chapters 1–7)     35
    RE Construction—Custom Pebble Beach Home     35
1.10 Case Study Questions and Exercise     37
    Questions     37
    Exercise     38
Chapter 2  Project Activity Requirements     39
2.1 Introduction     39
2.2 Information-Gathering Guidelines     40
    What Information Is to Be Gathered?     41
    Who Is Gathering Information?     42
    Reliability of Information     44
    Information Accuracy     49
    Information Sources     50
2.3 Activity Information Based on Project Structure     51
    Linear (Traditional Sequential Process Development)     52
    Incremental (Traditional Progressive Stage Development)     53
    Iterative (Features Addition Development, Waterfall, Agile)     55
    Adaptive (Learn and Build Development, Agile)     58
    Extreme (Exploratory Development)     59
2.4 Define Activities     62
    Project Deliverable Decomposition     63
    Define Activity Requirements     65
    Work Breakdown Structure (WBS)     68
2.5 Summary     71
2.6 Review Questions     72
2.7 Key Terms     73
2.8 PMBOK Connections (Fifth Edition)     73
2.9 Case Study Questions and Exercises (Use Case Study from Chapter 1)     74
    Questions     74
    Exercises     74
Chapter 3  Project Activity Sequencing     75
3.1 Introduction     75
3.2 Work Activity Definition     77
    Conceptual Planning     77
    Project Development     80
    Testing and Validation     80
    Reactive and Proactive Response     82
    Customer/Project Team Evaluation     84
    Project Closure     85
3.3 Work Activity Dependencies     87
    Activity Information     88
    Dependency Determination     94
3.4 Work Activity Sequencing Tools     96
    Precedence Diagramming Method     97
3.5 Summary     108
3.6 Review Questions     109
3.7 Key Terms     110
3.8 PMBOK Connections (5th Ed.)     111
3.9 Case Study Questions and Exercises (Use Case Study from Chapter 1)     111
    Questions     111
    Exercises     111
Chapter 4  Resource Estimating     113
4.1 Introduction     113
4.2 Types of Resources     116
    Direct and Indirect Resources     117
    Project Resources     118
    Contracted Resources     121
4.3 Resource Requirements     122
    Organizational Resources     123
    Project Resources     124
4.4 Resource Estimating Methods     128
    Determinate Estimating     128
    Alternatives Analysis     129
    Delphi Method     129
    Published Data Estimating     129
    Resource Leveling     130
4.5 Resource Estimating by Project Structure     132
    Linear and Incremental     132
    Iterative and Adaptive     133
    Extreme     134
4.6 Summary     135
4.7 Review Questions     136
4.8 Key Terms     137
4.9 PMBOK Connections (5th Ed.)     137
4.10 Case Study Questions and Exercise (Use Case Study from Chapter 1)     138
    Questions     138
    Exercise     138
Chapter 5  Project Activity Duration Analysis     139
5.1 Introduction     139
5.2 Duration Estimating Methods     140
    Subject Matter Expert Estimating (Delphi)     140
    Analogous Estimating     142
    Parametric Estimating     143
    Three-Point Estimating     144
    Contingency Estimating (Reserve Analysis)     147
5.3 Summary     149
5.4 Review Questions     150
5.5 Key Terms     150
5.6 PMBOK Connections (Fifth Edition)     151
5.7 Case Study Questions and Exercise (Use Case Study from Chapter 1)     151
    Questions     151
    Exercise     151
Chapter 6  Develop the Project Schedule     153
6.1 Introduction     153
6.2 Information for Schedule Development     154
    Project Charter     155
    Project Deliverable Specifications     155
    Work Breakdown Structure     156
    Activity Information Checklist     156
    Project Scope Statement     157
    Organizational Influences     157
    Customer Scheduling Requirements     159
    External Factors     160
6.3 Schedule Structuring Techniques     161
    Activity Disposition     162
    Activity Hierarchy     163
    Critical Path Method     164
    Theory of Constraints     166
    Critical Chain Method     167
    Resource Loading     169
    Scenario Analysis     171
6.4 Schedule Documentation Tools     173
    Software Tools     173
    Schedule Management     175
    Schedule Communication     176
6.5 Summary     177
6.6 Review Questions     178
6.7 Key Terms     178
6.8 PMBOK Connections (5th Ed.)     179
6.9 Case Study Questions and Exercise (Use Case Study from Chapter 1)     179
    Questions     179
    Exercise     180
Chapter 7  Control Project Schedule     181
7.1 Introduction     181
7.2 Schedule Control Information     183
    Schedule Baseline     183
    Work Activity Monitoring     185
    Earned Value Analysis     187
    Milestone Analysis     192
7.3 Schedule Control Techniques     192
    Contingency Control     193
    Schedule Crashing     193
    Resource Contracts     194
    Change Control     195
    Verify Control     196
7.4 Summary     197
7.5 Review Questions     199
7.6 Key Terms     199
7.7 PMBOK Connections (5th Ed.)     200
7.8 Case Study Questions and Exercise (Use Case Study from Chapter 1)     200
    Questions     200
    Exercise     200

Part II:  Project Cost Management     201
Chapter 8  Plan Cost Management     203

8.1 Introduction     203
8.2 Information for Planning Costs     205
    Cost Definitions     205
    Project Charter     209
    Statement of Work     209
    Project Manager’s Experience     210
    Subject Matter Experts     210
    Project Structures     211
8.3 Develop the Cost Management Plan     211
    Components of the Plan     212
8.4 Cost Management Plan Applications     213
    Organizational Strategic Planning     214
    Tool for Manager’s Tactical Use     214
8.5 Summary     216
8.6 Review Questions     217
8.7 Key Terms     218
8.8 PMBOK Connections (5th Ed.)     218
8.9 Case Study (Use for Part II, Chapters 8–11)     218
    Mass Brothers Automotive—IT Infrastructure Upgrade     218
8.10 Case Study Questions and Exercises     220
    Questions     220
    Exercises     220
Chapter 9  Estimate Project Costs     221
9.1 Introduction     221
9.2 Project Cost Requirements     223
    Statement of Work     224
    Work Breakdown Structure     224
    Activity Information Checklist     225
    Scope Statement     226
9.3 Cost Estimating Tools     227
    Cost Management Plan     228
    Cost Constraints     232
    Analogous Cost Estimating     234
    Parametric Cost Estimating     234
    Rough Order-of-Magnitude Estimating     235
    Subject Matter Experts     236
    Three-Point Cost Estimating     236
    Top-Down and Bottom-Up Estimating     239
    Contingency Cost Estimating     240
9.4 Estimating Based on Project Structures     242
    Linear and Incremental     242
    Iterative and Adaptive     243
    Extreme     244
9.5 Summary     245
9.6 Review Questions     246
9.7 Key Terms     247
9.8 PMBOK Connections (5th Ed.)     247
9.9 Case Study Questions and Exercises (Use Case Study from Chapter 8)     248
    Questions     248
    Exercises     248
Chapter 10  Develop a Project Budget     249
10.1 Introduction     249
10.2 Purpose of a Project Budget     250
    Budget at Completion     251
    Project Budget Baseline     252
    Manage the Triple Constraint     252
    Communicate Project Status     254
    Organizational Planning     254
10.3 Budget Methods     255
    Cost Aggregation Method     256
    Time-Phased Method     256
    Top-Down Budgeting     257
    Analogous Budgeting     259
    Funding Limit Reconciliation     260
10.4 Summary     261
10.5 Review Questions     262
10.6 Key Terms     263
10.7 PMBOK Connections (5th Ed.)     263
10.8 Case Study Questions and Exercises (Use Case Study from Chapter 8)     264
    Questions     264
    Exercises     264
Chapter 11  Control Project Costs     265
11.1 Introduction     265
11.2 Cost Control Data     266
    Monitor Costs     267
    Cost Analysis Tools     269
11.3 Cost Control Techniques     272
    Integrated Change Control     272
    Contingency Control     273
    Contract Control     274
    Procurement Review and Approval     276
    Control Verification     276
11.4 Summary     277
11.5 Review Questions     279
11.6 Key Terms     280
11.7 PMBOK Connections (5th Ed.)     280
11.8 Case Study Questions and Exercises (Use Case Study from Chapter 8)     281
    Questions     281
    Exercises     281

Part III:  Project Quality Management     283
Chapter 12  Plan Quality Management     285

12.1 Introduction     285
12.2 Components of a Quality Management Plan     286
    Establish Quality Monitoring     287
    Determine Analysis Methodologies     288
    Establish Quality Metrics     288
    Plan Quality Assurance     289
    Determine Cost of Quality     289
    Integrate a Change Control Process     290
    Determine Quality Controls     290
12.3 Tools for Quality Management Planning     291
    Statistical Sampling     291
    Design of Experiments     292
    Benchmarking     292
    Subject Matter Expert Meetings     293
    Brainstorming     294
12.4 Summary     294
12.5 Review Questions     295
12.6 Key Terms     296
12.7 PMBOK Connections (5th Ed.)     296
12.8 Case Study (Use for Part III, Chapters 12–14)     297
    Lewton Telecom—Engineering Prototype Project     297
12.9 Case Study Questions and Exercises     298
    Questions     298
    Exercises     299
Chapter 13  Conduct Quality Assurance     301
13.1 Introduction     301
13.2 Project Quality Assurance Data     302
    Quality Management Plan     303
    Organizational Quality Standards     303
    Industry Quality Standards     305
    Customer Quality Standards     305
    Quality Metric     307
13.3 Quality Assurance Tools     307
    Quality Audits     308
    Process Analysis     308
13.4 Quality Assurance Results     312
    Continuous Improvement     313
    Process Capability     313
    Change Requests     313
13.5 Summary     314
13.6 Review Questions     315
13.7 Key Terms     316
13.8 PMBOK Connections (5th Ed.)     316
13.9 Case Study Questions and Exercises (Use Case Study from Chapter 12)     316
    Questions     316
    Exercises     317
Chapter 14  Control Project Quality     319
14.1 Introduction     319
14.2 Establish What to Control     320
    Statement of Work     321
    Customer Specifications     321
    Workmanship Performance Reports     322
    Organizational Requirements     323
    Project Risk Register     324
14.3 Quality Control Tools and Techniques     324
    Inspections     325
    Statistical Sampling     326
    Design Review     327
    Seven Basic Quality Tools     328
14.4 QC Results     334
    Quality Improvements     335
    Updates to Project Schedule and Budget     335
    Verification of Deliverable Quality     336
    Project Process Updates     336
    Organizational Process Updates     337
14.5 Summary     337
14.6 Review Questions     340
14.7 Key Terms     340
14.8 PMBOK Connections (5th Ed.)     341
14.9 Case Study Questions and Exercises (Use Case Study from Chapter 12)     341
    Questions     341
    Exercises     341
Appendix A  Change Control Process     343
Bibliography     347
Index     349


The definitive guide to managing the "triple constraint" of time, cost, and quality in any project

Updates

Submit Errata

More Information

InformIT Promotional Mailings & Special Offers

I would like to receive exclusive offers and hear about products from InformIT and its family of brands. I can unsubscribe at any time.

Overview


Pearson Education, Inc., 221 River Street, Hoboken, New Jersey 07030, (Pearson) presents this site to provide information about products and services that can be purchased through this site.

This privacy notice provides an overview of our commitment to privacy and describes how we collect, protect, use and share personal information collected through this site. Please note that other Pearson websites and online products and services have their own separate privacy policies.

Collection and Use of Information


To conduct business and deliver products and services, Pearson collects and uses personal information in several ways in connection with this site, including:

Questions and Inquiries

For inquiries and questions, we collect the inquiry or question, together with name, contact details (email address, phone number and mailing address) and any other additional information voluntarily submitted to us through a Contact Us form or an email. We use this information to address the inquiry and respond to the question.

Online Store

For orders and purchases placed through our online store on this site, we collect order details, name, institution name and address (if applicable), email address, phone number, shipping and billing addresses, credit/debit card information, shipping options and any instructions. We use this information to complete transactions, fulfill orders, communicate with individuals placing orders or visiting the online store, and for related purposes.

Surveys

Pearson may offer opportunities to provide feedback or participate in surveys, including surveys evaluating Pearson products, services or sites. Participation is voluntary. Pearson collects information requested in the survey questions and uses the information to evaluate, support, maintain and improve products, services or sites, develop new products and services, conduct educational research and for other purposes specified in the survey.

Contests and Drawings

Occasionally, we may sponsor a contest or drawing. Participation is optional. Pearson collects name, contact information and other information specified on the entry form for the contest or drawing to conduct the contest or drawing. Pearson may collect additional personal information from the winners of a contest or drawing in order to award the prize and for tax reporting purposes, as required by law.

Newsletters

If you have elected to receive email newsletters or promotional mailings and special offers but want to unsubscribe, simply email information@informit.com.

Service Announcements

On rare occasions it is necessary to send out a strictly service related announcement. For instance, if our service is temporarily suspended for maintenance we might send users an email. Generally, users may not opt-out of these communications, though they can deactivate their account information. However, these communications are not promotional in nature.

Customer Service

We communicate with users on a regular basis to provide requested services and in regard to issues relating to their account we reply via email or phone in accordance with the users' wishes when a user submits their information through our Contact Us form.

Other Collection and Use of Information


Application and System Logs

Pearson automatically collects log data to help ensure the delivery, availability and security of this site. Log data may include technical information about how a user or visitor connected to this site, such as browser type, type of computer/device, operating system, internet service provider and IP address. We use this information for support purposes and to monitor the health of the site, identify problems, improve service, detect unauthorized access and fraudulent activity, prevent and respond to security incidents and appropriately scale computing resources.

Web Analytics

Pearson may use third party web trend analytical services, including Google Analytics, to collect visitor information, such as IP addresses, browser types, referring pages, pages visited and time spent on a particular site. While these analytical services collect and report information on an anonymous basis, they may use cookies to gather web trend information. The information gathered may enable Pearson (but not the third party web trend services) to link information with application and system log data. Pearson uses this information for system administration and to identify problems, improve service, detect unauthorized access and fraudulent activity, prevent and respond to security incidents, appropriately scale computing resources and otherwise support and deliver this site and its services.

Cookies and Related Technologies

This site uses cookies and similar technologies to personalize content, measure traffic patterns, control security, track use and access of information on this site, and provide interest-based messages and advertising. Users can manage and block the use of cookies through their browser. Disabling or blocking certain cookies may limit the functionality of this site.

Do Not Track

This site currently does not respond to Do Not Track signals.

Security


Pearson uses appropriate physical, administrative and technical security measures to protect personal information from unauthorized access, use and disclosure.

Children


This site is not directed to children under the age of 13.

Marketing


Pearson may send or direct marketing communications to users, provided that

  • Pearson will not use personal information collected or processed as a K-12 school service provider for the purpose of directed or targeted advertising.
  • Such marketing is consistent with applicable law and Pearson's legal obligations.
  • Pearson will not knowingly direct or send marketing communications to an individual who has expressed a preference not to receive marketing.
  • Where required by applicable law, express or implied consent to marketing exists and has not been withdrawn.

Pearson may provide personal information to a third party service provider on a restricted basis to provide marketing solely on behalf of Pearson or an affiliate or customer for whom Pearson is a service provider. Marketing preferences may be changed at any time.

Correcting/Updating Personal Information


If a user's personally identifiable information changes (such as your postal address or email address), we provide a way to correct or update that user's personal data provided to us. This can be done on the Account page. If a user no longer desires our service and desires to delete his or her account, please contact us at customer-service@informit.com and we will process the deletion of a user's account.

Choice/Opt-out


Users can always make an informed choice as to whether they should proceed with certain services offered by InformIT. If you choose to remove yourself from our mailing list(s) simply visit the following page and uncheck any communication you no longer want to receive: www.informit.com/u.aspx.

Sale of Personal Information


Pearson does not rent or sell personal information in exchange for any payment of money.

While Pearson does not sell personal information, as defined in Nevada law, Nevada residents may email a request for no sale of their personal information to NevadaDesignatedRequest@pearson.com.

Supplemental Privacy Statement for California Residents


California residents should read our Supplemental privacy statement for California residents in conjunction with this Privacy Notice. The Supplemental privacy statement for California residents explains Pearson's commitment to comply with California law and applies to personal information of California residents collected in connection with this site and the Services.

Sharing and Disclosure


Pearson may disclose personal information, as follows:

  • As required by law.
  • With the consent of the individual (or their parent, if the individual is a minor)
  • In response to a subpoena, court order or legal process, to the extent permitted or required by law
  • To protect the security and safety of individuals, data, assets and systems, consistent with applicable law
  • In connection the sale, joint venture or other transfer of some or all of its company or assets, subject to the provisions of this Privacy Notice
  • To investigate or address actual or suspected fraud or other illegal activities
  • To exercise its legal rights, including enforcement of the Terms of Use for this site or another contract
  • To affiliated Pearson companies and other companies and organizations who perform work for Pearson and are obligated to protect the privacy of personal information consistent with this Privacy Notice
  • To a school, organization, company or government agency, where Pearson collects or processes the personal information in a school setting or on behalf of such organization, company or government agency.

Links


This web site contains links to other sites. Please be aware that we are not responsible for the privacy practices of such other sites. We encourage our users to be aware when they leave our site and to read the privacy statements of each and every web site that collects Personal Information. This privacy statement applies solely to information collected by this web site.

Requests and Contact


Please contact us about this Privacy Notice or if you have any requests or questions relating to the privacy of your personal information.

Changes to this Privacy Notice


We may revise this Privacy Notice through an updated posting. We will identify the effective date of the revision in the posting. Often, updates are made to provide greater clarity or to comply with changes in regulatory requirements. If the updates involve material changes to the collection, protection, use or disclosure of Personal Information, Pearson will provide notice of the change through a conspicuous notice on this site or other appropriate way. Continued use of the site after the effective date of a posted revision evidences acceptance. Please contact us if you have questions or concerns about the Privacy Notice or any objection to any revisions.

Last Update: November 17, 2020